Shedule of Rates and Fees
By New Market Board of Commissioners Adopted: 1/16/01 and 9/17/01, amended 6/24/03, 5/17/05, 11/15/05, 7/18/06, 11/21/06, 12/19/06, 4/17/07, 9/18/07, 11/20/07, 5/20/08, 9/15/09, 3/15/11, 4/17/12, 4/16/13, 3/25/14, 5/17/16, 6/20/17, 8/3/21, 8/29/22, 3/21/23, 12/19/23, 4/21/26
Water Usage Rates
Minimum Bill: 0 -1500 gallons
| Charge | Rate Table | ||
| Single Residential | Minimum Rate | ||
| 3/4″ Meter | $26.00 | Plus Tax | WA / WZ |
| Commercial / Industrial | Minimum Rate | ||
| 3/4″ Meter | $36.45 | Plus Tax | WC / WY |
| 1″ Meter | $46.00 | Plus Tax | WD / WX |
| 1 1/2″ Meter | $55.60 | Plus Tax | WE |
| 2″ Meter | $65.15 | Plus Tax | WF / WV |
| 3″ Meter | $74.80 | Plus Tax | WG |
| 4″ Meter | $84.25 | Plus Tax | WH |
Water Rates / Thousand Gallons
| All over 1,500 Gallons | $7.15 | Plus Tax |
Special Charges and Policies
Preliminary Engineering Assessment for Water system delivery capability for line extension, residential development (>1 residence), or commercial development.
$200.00 – Non Refundable. Results of Assessment will be NMUD mailed to customer requesting and kept on file at NMUD
Engineering Design and Documentation
Cost + 10% – Charges to be paid prior to submittal to State for approval
Water charges for bulk sales, filling, flushing, loss due to damage or necessary repairs. (Customer, contractor, developer)
Rate Table WA – Volume charged based on calculations, measured or estimated flowrate by the NMUD Manager and approved by the BOC.
$50.00 prepayment fee required prior to allowing water use.